![]() A closer look at a Tunnell Consulting effort Setup/Changeover: We Help a Major Food Company Uncover Hidden Savings
In today's struggle to
increase revenues while controlling costs, many manufacturers have
overlooked the key production process of setup/ changeover, which
just might yield immediate savings through manpower reductions, increased
equipment utilization and the ability to run smaller lot sizes.
Recently, for example, we helped one major American food manufacturer
identify setup/changeover opportunities that paid an unexpected
annual savings of $3.4 million.
The setup/changeover process can include the setup of fixturing
in a machining process, the changeover of dies in a molding process,
or the setup/changeover of equipment for the food processing or
pharmaceutical industries. The latest buzz term in this area is
"one touch changeover" - the removal, direct repositioning and securing
of a new setup fixture, die or equipment with just one motion. It's
a motion that can take seconds, versus the familiar and tedious
steps of removal, resetting, adjusting and resecuring that can take
hours.
How do you convert to swifter changeover? By following the three-step
approach we used for this food manufacturer, and that classically
results in savings from 50 to 75%. One-quarter of the savings are
immediate, with no capital or equipment investment.
Step One: Step Two: Step Three: In one of this food manufacturer's facilities, for example, it
took 34 minutes to changeover a very large extrusion die. After
taping and evaluating the process, it was learned an immediate savings
was inherent in pre-positioning, and in having the correct tools
in the right location. This alone resulted in an immediate savings
of 9.25 changeover minutes (25% of the original time) with no investment
required. Further evaluation and redesign of the extrusion die mounting
method reduced total changeover time to 9.4 minutes. The mounting
redesign played a big role in success: This 9-minute changeover
process was reduced to 13.5 seconds - essentially one touch changeover.
For this manufacturer - and all companies that embark on these
process changes - there was a double bonus. Not only did direct
savings occur, but revenues increased because of additional production
hours available.
Like so many firms, these hidden process problems had been there
since inception - burning the company's precious time and money.